Runway & Taxiway Rehabilitation – Lien Khuong Airport


PROJECT TITLE

Runway and Taxiway Rehabilitation – Lien Khuong International Airport
Package No. 9: Construction, Supply and Installation of Equipment


GENERAL INFORMATION

  • Location: Duc Trong Commune, Lam Dong Province, Vietnam
  • Client: Airports Corporation of Vietnam (ACV)
  • Main Contractor: Vietnam Construction Investment Development JSC
  • VINA E&C Role: Subcontractor
  • Commencement Date: January 2, 2026
  • Status: Ongoing
  • Project Type: Grade I Transportation – Aviation Infrastructure

SCOPE OF WORK

  • Removal of existing runway structures
  • Ground improvement and foundation works
  • Construction of runway and taxiway
  • Cement concrete joints (M150/25)
  • Drainage system: stone masonry channels, box culverts
  • Cable duct and trench installation
  • Airfield marking and painting
  • Retaining walls and service roads construction

PROJECT DESCRIPTION

The Lien Khuong International Airport runway and taxiway rehabilitation project is a key infrastructure upgrade aimed at enhancing operational capacity and aviation safety in the Central Highlands region.

The project commenced on March 4, 2026, with a total investment of over VND 1,000 billion, under the management of Airports Corporation of Vietnam (ACV). The airport is temporarily closed until August 25, 2026, to facilitate construction activities.

Upon completion, the airport will meet ICAO 4E standards, enabling operations of wide-body aircraft such as Airbus A350 and Boeing 787. This upgrade is expected to significantly boost regional connectivity, tourism, and economic development in Lam Dong Province.

VINA E&C participates in the project as a subcontractor, executing critical construction works in compliance with strict technical, quality, and schedule requirements.

Related projects

Major Repair of Berths No. 5 and No. 6 at Vietsovpetro Port

VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.

The Gia Binh International Airport Construction Investment Project

The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.

VINA E&C COMMENCES PACKAGE 25: STRENGTHENING INFRASTRUCTURE AT THUONG PHUOC INTERNATIONAL BORDER GATE

Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates

UPGRADING ROAD NO. 6, LONG PHUOC WARD

On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

35-ha Petroleum Services Area – Sao Mai – Ben Dinh

VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.

Hung Thai ICD General Service Port

Construction work for Phase 2 general port

Package L – Shoreline Protection Works, Long Son Petrochemicals Complex

VINA E&C participated in Package L – Shoreline Protection Works under the Long Son Petrochemicals Complex Project. The scope included port revetments, site formation, internal roads, soft-soil treatment using PVD, flood-protection and drainage systems, a firewater tank and a pump house.

Hung Thai Fisheries Logistics Service Port And Lo Voi Port Upgrade And Expansion

VINA E&C participated in the construction of marine structures for the Hung Thai Fisheries Logistics Service Port and the Lo Voi Port Upgrade and Expansion Project. The scope included beam systems, deck slabs, pile connections, rubble-stone prisms, reverse filter layers and auxiliary berthing equipment.