The Hyosung Advanced Materials Factory project in Tan Thanh District, Ba Ria-Vung Tau Province, is an initiative undertaken by VINA E&C as the main contractor. The project focuses on the treatment of a 91,613 m2 area of land using the high-quality PHD method. With the groundbreaking ceremony taking place on September 5, 2023, the project is actively progressing.
VINA E&C not only acts as the project executor but also ensures both the quality and timely completion of the work. The project marks a significant step in the collaboration between VINA E&C and Hyosung Advanced Materials, promising positive contributions to the local economic development and the creation of numerous job opportunities. Through the synergy of VINA E&C and modern technology, the project aims to establish a modern and sustainable production infrastructure in the region.
General Information:
PROJECT: | Carbon Fiber Production plant |
CONTRACT PACKAGE: | Ground Treatment |
PROJECT LOCATION: | B7 Area, N2 Road, Phú Mỹ II Industrial Zone, Ba Ria -Vung Tau Province |
INVESTOR / MAIN CONTRACTOR: | Hyosung Vina Core Materials Co.,LTD |
JOB DESCRIPTION: | Strengthening Weak Ground through PVD, PHD, and Conventional Load Bearing Techniques |
DURATION: | 05/09/2023 - …. |
ROLE: | Main contractor |
STATUS: | In progress |
Package 4: Construction
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)
Package 07: Construction of warehouse and technical infrastructure
Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system
Construction of level 1 leveling level 1 - Division 2 (5.2ha)
Construction of utilities
Xử lý nền đất yếu
Package XL01: Construction and installation of all equipment