CARBON FIBER AND MATERIALS FACTORY PROJECT


The Hyosung Advanced Materials Factory project in Tan Thanh District, Ba Ria-Vung Tau Province, is an initiative undertaken by VINA E&C as the main contractor. The project focuses on the treatment of a 91,613 m2 area of land using the high-quality PHD method. With the groundbreaking ceremony taking place on September 5, 2023, the project is actively progressing.

VINA E&C not only acts as the project executor but also ensures both the quality and timely completion of the work. The project marks a significant step in the collaboration between VINA E&C and Hyosung Advanced Materials, promising positive contributions to the local economic development and the creation of numerous job opportunities. Through the synergy of VINA E&C and modern technology, the project aims to establish a modern and sustainable production infrastructure in the region.

General Information:

PROJECT: Carbon Fiber Production plant
CONTRACT PACKAGE: Ground Treatment
PROJECT LOCATION: B7 Area, N2 Road, Phú Mỹ II Industrial Zone, Ba Ria -Vung Tau Province
INVESTOR / MAIN CONTRACTOR: Hyosung Vina Core Materials Co.,LTD
JOB DESCRIPTION: Strengthening Weak Ground through PVD, PHD, and Conventional Load Bearing Techniques
DURATION: 05/09/2023 - ….
ROLE: Main contractor
STATUS: In progress

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment