The Vard Factory Expansion Project is a project that VINA E&C Company participates in as the Main Contractor. The project begins implementation from December 5, 2023 to 2023.
PROJECT INFORMATION
| PROJECT | Vard Factory Expansion Project |
| PACKAGE | Construction of utility systems: rainwater drainage system, wastewater drainage system, MEP manhole ditches, runway pipes, underground water tanks and pump stations |
| PROJECT LOCATION | Dong Xuyen Industrial Park, Rach Dua Ward, Vung Tau City, Ba Ria Vung Tau Province |
| INVESTOR | Vard Vung Tau.,ltd |
| JOB DESCRIPTION | - Construction of D300 sewer drainage system 1100m long - Sewer drainage system D300, D400, D500, D600, D1000 total length 2140m - Construction of MEP manhole ditches and road crossing pipes - 300m3 underground water tank - The pumping station has an area of 24m2 |
| PERIOD | 05/12/2022 - 2023 |
| IN ROLE | Contractors |
| STATUS | Processing |
Package 4: Construction
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)
Package 07: Construction of warehouse and technical infrastructure
Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system
Construction of level 1 leveling level 1 - Division 2 (5.2ha)
Construction of utilities
Xử lý nền đất yếu
Package XL01: Construction and installation of all equipment