The project is being implemented across Gia Binh, Luong Tai, Nhan Thang and Lam Thao communes in Bac Ninh Province. As an aviation infrastructure development, the project requires high standards of construction engineering, quality control, safety and schedule management.
Under the project, VINA E&C is involved in the construction of the VIP Terminal, components of the Air Traffic Control Tower, supporting facilities and technical infrastructure serving the operations of Gia Binh International Airport.
Location: Gia Binh, Luong Tai, Nhan Thang and Lam Thao communes, Bac Ninh Province
Partner: Masterise Aviation Infrastructure Joint Stock Company
Main Contractor: Coteccons Construction Joint Stock Company
Implementation Period: 2026
Sector: Transportation and Aviation Infrastructure Construction
The main construction activities include:
Construction of the VIP Terminal.
Construction of components of the Air Traffic Control Tower.
Construction of the VIP Building, Technical Building and Power House.
Construction of underground infrastructure tanks.
Integrated reinforced concrete works, including base-slab concrete casting, reinforcement installation, wall formwork erection and final concrete casting for:
Wastewater treatment tanks.
Firefighting water tanks.
Fuel tanks.
Domestic water tanks.
Construction of technical infrastructure and supporting facilities.
Installation of auxiliary equipment, including anchor plates, impact buffers, aviation lighting poles and towers, and access ladders.
Construction of power supply, water supply and lighting systems.





VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.
Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.
Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates
On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.
Construction work for Phase 2 general port
VINA E&C participated in Package L – Shoreline Protection Works under the Long Son Petrochemicals Complex Project. The scope included port revetments, site formation, internal roads, soft-soil treatment using PVD, flood-protection and drainage systems, a firewater tank and a pump house.
VINA E&C participated in the construction of marine structures for the Hung Thai Fisheries Logistics Service Port and the Lo Voi Port Upgrade and Expansion Project. The scope included beam systems, deck slabs, pile connections, rubble-stone prisms, reverse filter layers and auxiliary berthing equipment.
Featured projects