Our company is proud to be the Main Contractor in the project of Construction, supply and installation of equipment for the new headquarters of the Bank for Agriculture and Rural Development of Vietnam - Dong Long An Branch.
- Location: Ben Luc, Long An
- Project area:
- Implementation time: 11/2023 – 07/2024
- Role: Main contractor
- Status: In progress
With experience and professionalism in each item, we are committed to bringing a modern, solid project that fully meets construction standards, contributing to raising the new look of the banking system in Long An.
Package 4: Construction
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)
Package 07: Construction of warehouse and technical infrastructure
Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system
Construction of level 1 leveling level 1 - Division 2 (5.2ha)
Construction of utilities
Xử lý nền đất yếu
Package XL01: Construction and installation of all equipment
Featured projects