Major Repair of Berths No. 5 and No. 6 at Vietsovpetro Port


MAJOR REHABILITATION OF BERTHS NO. 5 AND NO. 6 – VIETSOVPETRO PORT

The Major Rehabilitation of Berths No. 5 and No. 6 at Vietsovpetro Port for Accommodating Vessels of up to 10,000 DWT is being implemented at Vietsovpetro Port, on the left bank of the Dinh River, Rach Dua Ward, Ho Chi Minh City.

The project falls under the transportation and seaport construction sector and requires a high level of technical expertise, construction planning and quality control due to the specialized conditions of marine infrastructure works.

SCOPE OF WORK

The main construction activities include:

  • Demolition and removal of the existing reinforced concrete berth structures, together with dredging of the underwater area.

  • Installation of more than 11,500 metres of D600-C PHC piles for the berth foundation system.

  • Construction of the berth’s beam, deck and pier structures, using more than 3,700 m³ of M450-B12 concrete and over 500 tonnes of reinforcing steel.

  • Installation of the fender and mooring bollard systems, together with approximately 192 metres of quayside crane rails.

  • Construction of the M&E, lighting and technical infrastructure systems required for berth operations.

PROJECT SCALE AND TECHNICAL REQUIREMENTS

Upon completion, Berths No. 5 and No. 6 will be upgraded to meet operational requirements and accommodate vessels of up to 10,000 DWT.

The simultaneous execution of multiple work packages—from demolition of existing structures, underwater construction and pile foundations to reinforced concrete structures, equipment installation and technical infrastructure—requires integrated construction management and rigorous control of safety, quality and schedule.

Through this project, VINA E&C continues to demonstrate its capabilities in delivering technically demanding transportation, seaport and infrastructure works, while further strengthening its experience in the rehabilitation, upgrading and development of port facilities serving industrial and oil and gas operations.


PROJECT INFORMATION

Project: Major Rehabilitation of Berths No. 5 and No. 6 at Vietsovpetro Port for Accommodating Vessels of up to 10,000 DWT
Location: Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City
Partner: Vietsovpetro Joint Venture
Implementation Period: 2026
Sector: Transportation and Seaport Construction
Operational Capacity: Accommodation of vessels of up to 10,000 DWT

Related projects

Runway & Taxiway Rehabilitation – Lien Khuong Airport

Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.

The Gia Binh International Airport Construction Investment Project

The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.

VINA E&C COMMENCES PACKAGE 25: STRENGTHENING INFRASTRUCTURE AT THUONG PHUOC INTERNATIONAL BORDER GATE

Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates

UPGRADING ROAD NO. 6, LONG PHUOC WARD

On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

35-ha Petroleum Services Area – Sao Mai – Ben Dinh

VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.

Hung Thai ICD General Service Port

Construction work for Phase 2 general port

INVESTMENT PROJECT TO UPGRADE AND EXPAND LO VOI PORT

Project: UPGRADE AND EXPAND LIME PORT Location: Phu My Town, Ba Ria - Vung Tau Province Investor: Hung Thai Petroleum Maritime Services Joint Stock Company

INVESTMENT PROJECT FOR CONSTRUCTION OF HUNG THAI AQUACULTURE LOGISTICS SERVICE PORT.

Horizontal and vertical beams, cap beams, bridge deck and rock prism, reverse filter layer behind sheet pile wall SW600B