Package L – Shoreline Protection Works is part of the Long Son Petrochemicals Complex Project located in Long Son Commune, Vung Tau City, Ba Ria – Vung Tau Province.
The project was developed by Long Son Petrochemicals Co., Ltd., with POSCO E&C Co., Ltd. serving as the General Contractor.
VINA E&C participated in the execution of Package L, with a contract value of VND 667,470,909,461. The scope covered shoreline-protection structures, site development, internal roads, soft-soil treatment and technical infrastructure serving the petrochemical complex.
The principal scope of work included:
Construction of the Main Port Revetment.
Construction of the Construction Port Revetment.
Execution of shoreline-protection works within the package.
Site formation works in Areas 6, 10, 12, 13, 14, 15, 16, 17 and 18.
Ground preparation and site-development works for subsequent project facilities.
Construction of roads within the Custom Area.
Construction of roads RD01, RD02, RD03, RD04, RD05 and RD06.
Development of internal transport infrastructure connecting the project areas.
Construction works within the flare area.
Soft Soil Treatment using prefabricated vertical drains (PVD).
Construction of the flood-protection system.
Construction of water collection and drainage systems.
Construction of the firewater tank and pump house.
The package demonstrates VINA E&C’s capabilities in delivering integrated, large-scale infrastructure works, including shoreline protection, site formation, internal roads, soft-soil treatment and drainage systems.
The simultaneous execution of multiple work disciplines within a petrochemical complex required effective construction management, technical coordination and strict control of safety, quality and schedule.
Project: Long Son Petrochemicals Complex
Package: Package L – Shoreline Protection Works
Location: Long Son Commune, Vung Tau City, Ba Ria – Vung Tau Province
Client: Long Son Petrochemicals Co., Ltd.
General Contractor: POSCO E&C Co., Ltd.
Sector: Infrastructure Construction
Period: 2019 - 2021
VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.
Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.
The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.
Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates
On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.
Construction work for Phase 2 general port
VINA E&C participated in Construction of Main Technical Infrastructure – Area A in Thu Duc City, Ho Chi Minh City, including site grading and ground treatment and internal road systems.
Featured projects