LONG SON PETROCHEMICAL COMPLEX PROJECT - PACKAGE L


Long Son Petrochemical Complex in Long Son Commune, Vung Tau City is considered a national key project in the petrochemical sector, with the largest scale in Southeast Asia, playing an important role in reducing dependence on imported plastic materials, supplying the petrochemical industry and creating momentum for economic development in the Ba Ria - Vung Tau region.

In this international project, VINA E&C is honored to participate as a subcontractor, working together with the Investor: Long Son Petrochemical Company Limited and the General Contractor: Posco E&C Company Limited - one of the largest construction corporations from Korea. This is an important mark demonstrating the prestige, capacity and reliability of VINA E&C in participating in complex multi-layered projects with high technical requirements.

General Information:

PROJECT: LONG SON PETROCHEMICAL COMPLEX PROJECT
CONTRACT PACKAGE: Coastal protection work
PROJECT LOCATION: Long Son Commune, Vung Tau City, Ba Ria Vung Tau Province
INVESTOR / MAIN CONTRACTOR:

- Investor: Long Son Petrochemical Company Limited

- General contractor: Posco E&C Company Limited

JOB DESCRIPTION: - Flare area
- Land reclamation by PVD
- Flood control system, drainage system
- Fire fighting tank and pump house
DURATION: 01/06/2019 - 30/10/2021
ROLE: Subcontractor
STATUS: Completed

Related projects

Runway & Taxiway Rehabilitation – Lien Khuong Airport

Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.

The Gia Binh International Airport Construction Investment Project

The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.

Hung Thai ICD General Service Port

Construction work for Phase 2 general port