INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT


Project: Investment and Construction of the Tan Cang Nhon Trach Drug Warehouse (15 ha)

VINA E&C is proud to be the main contractor for the Tan Cang Nhon Trach Drug Warehouse project, a strategic initiative aimed at completing a modern logistics supply chain in the key southern economic region. In our pivotal role, we have committed to constructing a facility that meets the highest quality standards, helping to optimize storage and distribution activities. This project stands out with the following key features:

  • Strategic Location: Situated in Nhon Trach district, Dong Nai province, the area boasts convenient transportation connections, playing a vital role in the national logistics network.

  • Modern Scale and Functionality: The facility includes a two-story warehouse with a total floor area of up to , along with an internal road system covering , both designed for efficient and safe goods flow.

  • High Technical Standards: The construction adheres to strict standards, including advanced security, landscaping, and lighting systems, to ensure the building's long-term sustainability and safety.

  • Role as Main Contractor: VINA E&C is fully responsible for the entire process, from construction to completion, affirming our management capabilities and expertise in large-scale projects.

This project is not just a building; it is a testament to our commitment to delivering high-quality construction solutions that contribute to the sustainable development of Vietnam's logistics industry.

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment