VINA E&C participated in 35-ha Petroleum Services Area – Sao Mai – Ben Dinh in Vung Tau City, Ba Ria – Vung Tau Province. Site Filling, Yard Works and Water Supply and Drainage Systems. Partner/Project Owner: Sao Mai – Ben Dinh Petroleum Investment JSC. Implementation period: 2024–Present.
Scope of work
• Embankments for site-filling works.
• Site filling and construction-platform preparation.
• Internal roads and yard areas.
• HDPE water-supply systems.
• Drainage systems using reinforced-concrete culverts.
• Integrated technical infrastructure for the petroleum-services area.
The project demonstrates VINA E&C’s capabilities in construction planning, quality control, safety and schedule management for site filling and petroleum-services infrastructure.
/1789096873674_1126657323863708745_g8814633454535119032_9cd0e1474342b2263fd6f6a75bfc7709.jpg)
/9.jpg)
/1789876842855_3852137828914985374_g8814633454535119032_47ae13fa3f028fed39faa0dbab6a2dc2.jpg)
/1789785608549_1105817785430011571_g8814633454535119032_79baa4103a8e6553234daaf07052ea30.jpg)
VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.
Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.
The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.
Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates
On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
Construction work for Phase 2 general port
Project: UPGRADE AND EXPAND LIME PORT Location: Phu My Town, Ba Ria - Vung Tau Province Investor: Hung Thai Petroleum Maritime Services Joint Stock Company
Horizontal and vertical beams, cap beams, bridge deck and rock prism, reverse filter layer behind sheet pile wall SW600B
Featured projects