THI VAI BULK CARGO WAREHOUSE NO. 1 PROJECT


General Information:

DỰ ÁN Dự án Nhà Máy sản xuất sợi Carbon Fiber
GÓI THẦU Xử lý nền đất yếu
VỊ TRÍ DỰ ÁN Lô 7, Đường N2, KCN Phú Mỹ 2, Tỉnh BR-VT

   

    With a huge total investment, Thi Vai Bulk Cargo Warehouse No. 1 project was implemented by Thi Vai General Port Joint Stock Company, with VINA E&C as the main contractor. The project has a warehouse area of ​​6,424 m², a durable steel structure, specially designed for bulk cargo with international standard ventilation, lighting and fire protection systems.

    From July 2017 to October 2018, the project was constructed and completed on schedule, bringing an important step forward in improving the storage and loading capacity of Thi Vai port, reducing logistics pressure for the Ba Ria - Vung Tau area. The project not only contributes to optimizing port operations but also affirms the role of Thi Vai as a strategic cargo transit center of the Southeast, creating a solid foundation for the development of industry and trade in the whole region.

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment