VINA E&C is proud to serve as the main contractor for the project of upgrading Alley 187, Long Phuoc Street, Long Phuoc Ward, Thu Duc City. This project is part of Package No. 4, which includes compensation costs, traffic safety assurance, and contingency expenses, aiming to enhance the urban traffic system and improve the living standards of local residents.
The project addresses the deterioration of existing infrastructure, improves traffic flow, strengthens regional connectivity, and gives the local transportation system a more modern and uniform appearance. It demonstrates VINA E&C’s strong commitment to supporting Thu Duc City in its journey toward urban renewal and sustainable development.
| Item | Details |
|---|---|
| Project Name | Upgrading Alley 187, Long Phuoc Street, Long Phuoc Ward, Thu Duc City |
| Package | Package No. 4: Construction (including compensation, traffic safety assurance, and contingency costs) |
| Location | Long Phuoc Ward, Thu Duc City, Ho Chi Minh City |
| Investor | Thu Duc City Infrastructure Development Center |
| Contract No. | 06/2025/HĐ.XL-PTHT_107 |
| Scope of Works | Road construction |
| Timeline | 05/06/2025 – 05/10/2025 |
| Form | Main Contractor |
| Grade | Transportation |
VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.
Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.
The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.
Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates
On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.
VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.
Construction work for Phase 2 general port
VINA E&C participated in Package L – Shoreline Protection Works under the Long Son Petrochemicals Complex Project. The scope included port revetments, site formation, internal roads, soft-soil treatment using PVD, flood-protection and drainage systems, a firewater tank and a pump house.
VINA E&C participated in the construction of marine structures for the Hung Thai Fisheries Logistics Service Port and the Lo Voi Port Upgrade and Expansion Project. The scope included beam systems, deck slabs, pile connections, rubble-stone prisms, reverse filter layers and auxiliary berthing equipment.