Hung Thai ICD Project - Phase 2 in Ho Chi Minh City. Vung Tau, Ba Ria - Vung Tau Province is invested by Hung Thai Holding Joint Stock Company and Vina E&C took on the role of the main contractor. This item focuses on construction of wharves and embankments after the wharf and repairing embankments behind the wharf, contributing to improving the capacity of general port infrastructure, serving the needs of transport - logistics in the region.
Project information:
| Project Name | ICD Hung Thai – Phase 2 |
| Package | Construction works for General Port – Phase 2 |
| Location | Vung Tau City, Ba Ria – Vung Tau Province |
| Investor | Hung Thai Holding Joint Stock Company |
| Contract No. | 1204/2024/HĐTC/HTH/VN |
| Scope of Work | Construction of the berth, revetment behind the berth, and road repair behind the revetment |
| Implementation Time | 12/04/2024 – 2025 |
| Form | Main Contractor |
| Status | In Progress |
VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.
Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.
The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.
Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates
On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.
VINA E&C participated in Package L – Shoreline Protection Works under the Long Son Petrochemicals Complex Project. The scope included port revetments, site formation, internal roads, soft-soil treatment using PVD, flood-protection and drainage systems, a firewater tank and a pump house.
VINA E&C participated in the construction of marine structures for the Hung Thai Fisheries Logistics Service Port and the Lo Voi Port Upgrade and Expansion Project. The scope included beam systems, deck slabs, pile connections, rubble-stone prisms, reverse filter layers and auxiliary berthing equipment.
Featured projects