Hung Thai Port, Warehouse, and Infrastructure Investment Project


In 2016, when the demand for logistics and maritime services in Ba Ria - Vung Tau area grew strongly, the Hung Thai Technical Infrastructure Construction Project, Warehouse System and Maritime Service Port was born as a strategic step to meet the urgent demand for logistics infrastructure.

This is not only a key investment project, but also a typical project demonstrating the long-term vision of Hung Thai Petroleum Maritime Services Joint Stock Company in building a large-scale logistics, storage and trading center in Phu My Town. As the main contractor, VINA E&C has directly undertaken key items, contributing to affirming its reputation and capacity to implement large-scale projects with complex technical requirements.

General Information:

PROJECT: Hung Thai Port, Warehouse, and Infrastructure Investment Project.
CONTRACT PACKAGE: Construction of technical infrastructure, warehouse system & Hung Thai maritime service port
PROJECT LOCATION: Phu My Town, Ba Ria - Vung Tau Province
INVESTOR / MAIN CONTRACTOR: Hung Thai Petroleum Maritime Services Joint Stock Company
JOB DESCRIPTION: - Construction of Warehouse No. 1 (scale 21,722 m2) & No. 2 (scale 17,760 m2)
- Construction of traffic roads (scale 13,800 m2), weighing station, pile driving,...
- Construction of dredging & cargo wharf (scale 5000 ton port)
DURATION: 20/06/2016 - 20/07/2017
ROLE: Main contractor
STATUS: Completed

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment