WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2


VINA E&C, in consortium with partners, is implementing the land levelling and technical infrastructure project for Phase 2 of the 35-hectare Oil & Gas Service Zone in Vung Tau City. Spanning 21.5 hectares, the project covers key works such as geo-tube embankment, road foundation with crushed stone base, HDPE water supply system, and reinforced concrete drainage network.

This project plays a vital role in improving the infrastructure foundation for the oil & gas sector, while also supporting investment attraction and socio-economic development in Ba Ria – Vung Tau. It further demonstrates VINA E&C’s capacity to execute large-scale, strategic infrastructure projects with high technical requirements.

Item Details
Project Name Land Levelling and Infrastructure – Phase 2 (21.5ha), Oil & Gas Service Zone (35ha)
Package Land levelling, drainage system, water supply system construction
Location Vung Tau City, Ba Ria – Vung Tau Province
Investor Sao Mai – Ben Dinh Oil & Gas Investment JSC
Scope of Works Land levelling, geo-tube embankment, road with crushed stone base, HDPE water supply, reinforced concrete drainage
Timeline 06/06/2025 – 03/03/2026
Form Consortium
Status Ongoing

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment