CARBON FIBER AND MATERIAL FACTORY - CONSTRUCTION UTILITIES


VINA E&C Investment and Construction takes on the role of main contractor in the Carbon Fiber and Material Manufacturing Plant project invested by Hyosung Vina Chemical Co., Ltd. This is a high-tech industrial project with large-scale infrastructure, contributing to the advancement of Vietnam’s industrial material sector.

The project involves the construction of warehouses, utility systems, water treatment facilities, and auxiliary infrastructure, showcasing VINA E&C’s capacity to execute complex, technology-driven projects. With a commitment to quality, safety, and efficiency, VINA E&C affirms its position as a trusted partner in the field of high-tech industrial construction.

Category Details
Project Name Carbon Fiber and Material Manufacturing Plant
Package General construction works
Location Phu My Town, Ba Ria – Vung Tau Province
Investor Hyosung Vina Chemical Co., Ltd.
Scope of Work Construction of 400m² warehouse, 800m² office building, 16,000m³ reinforced concrete foundation blocks, 22-ton steel structure, 1645m² oil tank, 1200m² water treatment facility, 1200m² cooling tower, N2 system, AN system, DMSO system, cafeteria, parking area, and auxiliary infrastructure
Implementation Period 20/04/2024 – 30/06/2025
Role Main Contractor
Project Grade Industrial Construction
Status Ongoing

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment