VINA E&C participated in Lac Hoa II Wind Power Plant in Vinh Chau Town, Soc Trang Province.
Construction of Infrastructure and Turbine Erection Yard.
Partner/Project Owner: Lac Hoa 2 Wind Power Company Limited.
Implementation period: 2021–2024.
Scope of work
• Site clearing, cleanup and removal of organic topsoil.
• Site grading and preparation.
• Temporary access roads and internal roads.
• Wind-turbine erection yard.
• Equipment laydown areas.
The project demonstrates VINA E&C’s capabilities in construction planning, quality control, safety and schedule management for energy infrastructure.
VINA E&C serves as the main contractor for Package No. 07 – Construction of the Warehouse and Technical Infrastructure under the warehouse investment project at Tan Cang Nhon Trach ICD. The project comprises a 6,750 m² warehouse together with surrounding roads, yards, slope protection and integrated technical infrastructure.
VINA E&C participated in Construction of Main Technical Infrastructure – Area A in Phu My, Ba Ria – Vung Tau, including soft soil treatment using the phd method over approximately 91,600 m² and site grading and preparation.
VINA E&C participated in Soft Soil Treatment Package in Phu My Town, Ba Ria – Vung Tau Province, including soft soil treatment using the phd method over approximately 251,000 m².
Basic construction package 1
Concrete and construction work for HPG and EGF Tanks
Construction and installation of bulk cargo warehouse No. 1
Construction of technical floors, warehouse systems & Hung Thai maritime services