Lac Hoa II Wind Power Plant


VINA E&C participated in Lac Hoa II Wind Power Plant in Vinh Chau Town, Soc Trang Province.

Construction of Infrastructure and Turbine Erection Yard.

Partner/Project Owner: Lac Hoa 2 Wind Power Company Limited.

Implementation period: 2021–2024.

Scope of work
• Site clearing, cleanup and removal of organic topsoil.
• Site grading and preparation.
• Temporary access roads and internal roads.
• Wind-turbine erection yard.
• Equipment laydown areas.

The project demonstrates VINA E&C’s capabilities in construction planning, quality control, safety and schedule management for energy infrastructure.

Related projects

Tan Cang Nhon Trach ICD Warehouse

VINA E&C serves as the main contractor for Package No. 07 – Construction of the Warehouse and Technical Infrastructure under the warehouse investment project at Tan Cang Nhon Trach ICD. The project comprises a 6,750 m² warehouse together with surrounding roads, yards, slope protection and integrated technical infrastructure.

CARBON FIBER AND MATERIAL FACTORY - CONSTRUCTION UTILITIES

VINA E&C participated in Construction of Main Technical Infrastructure – Area A in Phu My, Ba Ria – Vung Tau, including soft soil treatment using the phd method over approximately 91,600 m² and site grading and preparation.

Bio-BDO Biological Products Factory

VINA E&C participated in Soft Soil Treatment Package in Phu My Town, Ba Ria – Vung Tau Province, including soft soil treatment using the phd method over approximately 251,000 m².

SOUTHERN VIETNAM PETROCHEMICAL COMPLEX PROJECT - BIDDING PACKAGE A2

Concrete and construction work for HPG and EGF Tanks

THI VAI BULK CARGO WAREHOUSE NO. 1 PROJECT

Construction and installation of bulk cargo warehouse No. 1

Hung Thai Port, Warehouse, and Infrastructure Investment Project

Construction of technical floors, warehouse systems & Hung Thai maritime services