Project Overview
The Stavian Aluminium Packaging Foil Rolling Plant is an industrial project located in Quan Do Industrial Cluster, Doan Dao Commune, Hung Yen Province, Vietnam. The project is developed by Công ty Cổ phần Stavian Bao bì Nhôm, with VINA E&C serving as a construction contractor.
Project Information
Project: Stavian Aluminium Packaging Foil Rolling Plant.
Location: Lot E, Land Parcel No. 519, Quan Do Industrial Cluster, Doan Dao Commune, Hung Yen Province, Vietnam.
Sector: Industrial Construction.
Client: Công ty Cổ phần Stavian Bao bì Nhôm.
Construction Supervision Consultant: Công ty Cổ phần CONINCO Đầu tư Phát triển Hạ tầng và Tư vấn Xây dựng.
Construction Contractor: VINA E&C INVESTMENT AND CONSTRUCTION JSC.
VINA E&C’s Role
VINA E&C undertakes construction works within its contractual scope, coordinating with the client, the construction supervision consultant and other relevant parties throughout project implementation.
Quality, schedule and occupational safety are central to VINA E&C’s approach. The company focuses on appropriate resource allocation, quality control and coordination to meet the project’s technical requirements, schedule and contractual commitments.
The project adds to VINA E&C’s industrial construction portfolio and provides an opportunity to develop long-term cooperation with the client and project partners.
VINA E&C serves as the main contractor for Package No. 07 – Construction of the Warehouse and Technical Infrastructure under the warehouse investment project at Tan Cang Nhon Trach ICD. The project comprises a 6,750 m² warehouse together with surrounding roads, yards, slope protection and integrated technical infrastructure.
VINA E&C participated in Construction of Main Technical Infrastructure – Area A in Phu My, Ba Ria – Vung Tau, including soft soil treatment using the phd method over approximately 91,600 m² and site grading and preparation.
VINA E&C participated in Soft Soil Treatment Package in Phu My Town, Ba Ria – Vung Tau Province, including soft soil treatment using the phd method over approximately 251,000 m².
Basic construction package 1
The Hyosung Advanced Materials Factory project in Ba Ria-Vung Tau Province, undertaken by VINA E&C as the main contractor, focuses on the treatment of a 91,613 m2 area of land using the high-quality PHD method. The project implementation ensures both quality and progress in the work. The goal of the project is to establish a modern and sustainable production infrastructure in the region, contributing to the local economic development and creating numerous employment opportunities.
VINA E&C participated in the construction of utility infrastructure systems for the VARD Plant Expansion Project at Dong Xuyen Industrial Park, Vung Tau City. The scope included drainage systems, MEP trenches and manholes, road-crossing pipes, a 300 m³ underground water tank and a pump station building.
VINA E&C participated in Construction of Infrastructure and Turbine Erection Yard in Vinh Chau Town, Soc Trang Province, including site clearing, cleanup and removal of organic topsoil and site grading and preparation.
VINA E&C participated in Package A2 – Structural Construction Works (Package 1) under the Long Son Petrochemicals Complex Project. The scope included site development, reinforced-concrete tank foundations, pipe-rack foundations, structural steel works, underground piping and drainage systems.
VINA E&C participated in the construction and installation of Bulk Cargo Warehouse No. 1 at Thi Vai General Port, Ba Ria – Vung Tau Province. The 6,424 m² facility was developed to support bulk-cargo storage and port operations.