LPG LIQUEFIED PETROLEUM GAS RESERVOIR CONSTRUCTION PROJECT


VINA E&C is proud to be a subcontractor in the LPG Storage Terminal Project located in Bac Tien Phong, Quang Ninh Province. This is a Grade I industrial project of significant scale, contributing to the expansion and strengthening of Vietnam’s national energy infrastructure.

Within this package, VINA E&C undertakes several critical works:

PROJECT INFORMATION:

Category Details
Project LPG Storage Terminal – Capacity of 176,400 m³
Package Basic Construction – Package 1
Location Bac Tien Phong, Quang Ninh Province
Client TTCL Vietnam Co., Ltd
Scope of Works - Earthwork excavation ~30,000 m³ - Construction of foundations for tanks C3 & C4 with 6,000 m³ of concrete and 1,000 tons of steel - Construction of Pipe rack ~1 km
Schedule 23/01/2024 – 15/12/2025
Role Subcontractor
Project Grade Grade I Industrial Project
Status Ongoing

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment