General Information:
| DỰ ÁN | Dự án Nhà Máy sản xuất sợi Carbon Fiber |
| GÓI THẦU | Xử lý nền đất yếu |
| VỊ TRÍ DỰ ÁN | Lô 7, Đường N2, KCN Phú Mỹ 2, Tỉnh BR-VT |
With a huge total investment, Thi Vai Bulk Cargo Warehouse No. 1 project was implemented by Thi Vai General Port Joint Stock Company, with VINA E&C as the main contractor. The project has a warehouse area of 6,424 m², a durable steel structure, specially designed for bulk cargo with international standard ventilation, lighting and fire protection systems.
From July 2017 to October 2018, the project was constructed and completed on schedule, bringing an important step forward in improving the storage and loading capacity of Thi Vai port, reducing logistics pressure for the Ba Ria - Vung Tau area. The project not only contributes to optimizing port operations but also affirms the role of Thi Vai as a strategic cargo transit center of the Southeast, creating a solid foundation for the development of industry and trade in the whole region.
Package 4: Construction
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)
Package 07: Construction of warehouse and technical infrastructure
Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system
Construction of level 1 leveling level 1 - Division 2 (5.2ha)
Construction of utilities
Xử lý nền đất yếu
Package XL01: Construction and installation of all equipment