Vard Factory Expansion Project


The Vard Factory Expansion Project is a project that VINA E&C Company participates in as the Main Contractor. The project begins implementation from December 5, 2023 to 2023.

PROJECT INFORMATION

PROJECT Vard Factory Expansion Project
PACKAGE Construction of utility systems: rainwater drainage system, wastewater drainage system, MEP manhole ditches, runway pipes, underground water tanks and pump stations
PROJECT LOCATION Dong Xuyen Industrial Park, Rach Dua Ward, Vung Tau City, Ba Ria Vung Tau Province
INVESTOR Vard Vung Tau.,ltd
JOB DESCRIPTION - Construction of D300 sewer drainage system 1100m long
- Sewer drainage system D300, D400, D500, D600, D1000 total length 2140m
- Construction of MEP manhole ditches and road crossing pipes
- 300m3 underground water tank
- The pumping station has an area of 24m2
PERIOD 05/12/2022 - 2023
IN ROLE Contractors
STATUS Processing

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE

Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment