VINA E&C, in consortium with partners, is implementing the land levelling and technical infrastructure project for Phase 2 of the 35-hectare Oil & Gas Service Zone in Vung Tau City. Spanning 21.5 hectares, the project covers key works such as geo-tube embankment, road foundation with crushed stone base, HDPE water supply system, and reinforced concrete drainage network.
This project plays a vital role in improving the infrastructure foundation for the oil & gas sector, while also supporting investment attraction and socio-economic development in Ba Ria – Vung Tau. It further demonstrates VINA E&C’s capacity to execute large-scale, strategic infrastructure projects with high technical requirements.
Item | Details |
---|---|
Project Name | Land Levelling and Infrastructure – Phase 2 (21.5ha), Oil & Gas Service Zone (35ha) |
Package | Land levelling, drainage system, water supply system construction |
Location | Vung Tau City, Ba Ria – Vung Tau Province |
Investor | Sao Mai – Ben Dinh Oil & Gas Investment JSC |
Scope of Works | Land levelling, geo-tube embankment, road with crushed stone base, HDPE water supply, reinforced concrete drainage |
Timeline | 06/06/2025 – 03/03/2026 |
Form | Consortium |
Status | Ongoing |
Package 4: Construction
Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)
Package 07: Construction of warehouse and technical infrastructure
Full package of design, appraisal and assessment, construction permit application and construction of COD improvement system
Construction of level 1 leveling level 1 - Division 2 (5.2ha)
Construction of utilities
Xử lý nền đất yếu
Package XL01: Construction and installation of all equipment
Basic construction package 1