The project to upgrade and expand Lo Voi port is invested by Hung Thai Petroleum Maritime Services Joint Stock Company, with the goal of increasing exploitation capacity, meeting the increasing demand for maritime transport in the key economic region of the South.
VINA E&C was selected as the main contractor, directly undertaking important construction items:
With a total contract value of more than 140 billion VND, the project demonstrates the investor's trust in the reputation and construction capacity of VINA E&C.
General information:
PROJECT: | INVESTMENT PROJECT TO UPGRADE AND EXPAND LO VOI PORT |
CONTRACT PACKAGE: | Horizontal and vertical girder system, cap girder, bridge deck & Rock prism, reverse filter layer behind SW600B sheet pile wall |
PROJECT LOCATION: | Phu My Town, Ba Ria - Vung Tau Province. |
INVESTOR / MAIN CONTRACTOR: | Hung Thai Petroleum Maritime Services Joint Stock Company |
JOB DESCRIPTION: | - Construction of the connection system between beams and D500C piles. - Supply, install, remove pile clamps, pile head clamps and construction floor system. - Supply and construction of boulder foundations. - Supply, sew, fold edges, load geotextiles for boulder foundations. - Supply and install anchor flanges, bumpers, signal columns, signal light posts, and ladders. |
DURATION: | 2014 - 2015 |
ROLE: | Main contractor |
STATUS: | In progress |
Coastal protection work
Horizontal and vertical beams, cap beams, bridge deck and rock prism, reverse filter layer behind sheet pile wall SW600B
Construction of jetty, the house receiving seafood and purchasing equipment for the fishing port
Wharf and drainage system construction
Construction of port, dyke stone; Casting and installation of breakwater wall; Construction of Cellular sink casting; Construction and installation of Tetrapod wave breakers
Construction and installation of steel structure, Construction of warehouse floor steel, MEP, Fire fighting system, Operation management system
Concrete works, Construction of fences, gates and roads