INVESTMENT PROJECT TO UPGRADE AND EXPAND LO VOI PORT


The project to upgrade and expand Lo Voi port is invested by Hung Thai Petroleum Maritime Services Joint Stock Company, with the goal of increasing exploitation capacity, meeting the increasing demand for maritime transport in the key economic region of the South.

VINA E&C was selected as the main contractor, directly undertaking important construction items:

  • Construction of a system of boulders to reinforce and protect the port shore structure.
  • Fabrication and installation of reinforced concrete structures with large loads.
  • Construction and completion of anchor systems, fenders, signal pillars, and lighting for waterway traffic safety.

With a total contract value of more than 140 billion VND, the project demonstrates the investor's trust in the reputation and construction capacity of VINA E&C.

General information:

PROJECT: INVESTMENT PROJECT TO UPGRADE AND EXPAND LO VOI PORT
CONTRACT PACKAGE: Horizontal and vertical girder system, cap girder, bridge deck & Rock prism, reverse filter layer behind SW600B sheet pile wall
PROJECT LOCATION: Phu My Town, Ba Ria - Vung Tau Province.
INVESTOR / MAIN CONTRACTOR: Hung Thai Petroleum Maritime Services Joint Stock Company
JOB DESCRIPTION: - Construction of the connection system between beams and D500C piles.
- Supply, install, remove pile clamps, pile head clamps and construction floor system.
- Supply and construction of boulder foundations.
- Supply, sew, fold edges, load geotextiles for boulder foundations.
- Supply and install anchor flanges, bumpers, signal columns, signal light posts, and ladders.
DURATION: 2014 - 2015
ROLE: Main contractor
STATUS: In progress

Related projects

Major Repair of Berths No. 5 and No. 6 at Vietsovpetro Port

VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.

Runway & Taxiway Rehabilitation – Lien Khuong Airport

Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.

The Gia Binh International Airport Construction Investment Project

The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.

VINA E&C COMMENCES PACKAGE 25: STRENGTHENING INFRASTRUCTURE AT THUONG PHUOC INTERNATIONAL BORDER GATE

Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates

UPGRADING ROAD NO. 6, LONG PHUOC WARD

On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

35-ha Petroleum Services Area – Sao Mai – Ben Dinh

VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.

Hung Thai ICD General Service Port

Construction work for Phase 2 general port

INVESTMENT PROJECT FOR CONSTRUCTION OF HUNG THAI AQUACULTURE LOGISTICS SERVICE PORT.

Horizontal and vertical beams, cap beams, bridge deck and rock prism, reverse filter layer behind sheet pile wall SW600B