INVESTMENT PROJECT FOR CONSTRUCTION OF HUNG THAI AQUACULTURE LOGISTICS SERVICE PORT.


The Hung Thai Seafood Logistics Port Construction Investment Project is one of the typical projects that VINA E&C participated in as the main contractor.

In this project, VINA E&C undertook many complex technical items, from the construction of the connection system between D500C beams and piles, equipment installation, steel structure to processing - installing formwork, reinforcement, supplying and pouring concrete for horizontal and vertical dams, nose dams, bridge decks, railings, signal lights, elevators, etc. All were implemented with a high sense of responsibility, complying with modern technological processes and ensuring progress and quality.

The project not only affirms the reputation and capacity of VINA E&C in the field of seaport infrastructure construction but also contributes significantly to improving the capacity of seafood logistics services in Ba Ria - Vung Tau province.

General Information:

PROJECT: INVESTMENT IN CONSTRUCTION OF HUNG THAI AQUACULTURE LOGISTICS SERVICE PORT.
CONTRACT PACKAGE: Horizontal and vertical beams, cap beams, bridge deck and rock prism, reverse filter layer behind sheet pile wall SW600B
PROJECT LOCATION: Phu My Town, Ba Ria - Vung Tau Province
INVESTOR / MAIN CONTRACTOR: Hung Thai Petroleum Maritime Services Joint Stock Company
JOB DESCRIPTION: - Construction of the connection system between the beam and the D500C pile.
- Supply, installation, dismantling of the pile belt, pile head clamp and the construction floor system.
- Supply and construction of the boulder prism.
- Supply, sewing, folding, loading geotextile for the boulder prism.
- Supply and installation of anchor flanges, bumpers, signal columns, signal light posts, and ladders.
DURATION: 2014 - 2015
ROLE: Main contractor
STATUS: In progress

Related projects

Runway & Taxiway Rehabilitation – Lien Khuong Airport

Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.

The Gia Binh International Airport Construction Investment Project

The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.

Hung Thai ICD General Service Port

Construction work for Phase 2 general port