Bien Hoa Airbase Dioxin Remediation Project – Phase 1

29.09.2025

Project name Bien Hoa Airbase Dioxin Remediation Project – Phase 1
Package Phase 1 Processing (TP1)
Location Bien Hoa, Dong Nai Province
Owner / Main Contractor Nelson Environmental Remediation USA LTD
Time 29/09/2025
Status Ongoing
Sector Environmental & Energy Works / Technical Infrastructure

The Bien Hoa Airbase Dioxin Remediation Project – Phase 1 is a specialized environmental project requiring strict technical control and close coordination among participating parties. In Phase 1 Processing (TP1), VINA E&C takes part as a subcontractor, carrying out construction and steel structure works for multiple facilities in Bien Hoa, Dong Nai Province.

The scope of work includes:
- Feed Material Storage Building (FMSB)
- Treated Material Storage Building (TMSB)
- Treatment Plant
- Conveyor Canopy
- Connection Road from FMSB to TMSB
- Treated Material Storage Area and Equalization Pond
- Central Control Container
- Fuel Station
- Workshop
- Office
- Process Water Storage Area
- Infrastructure and Utilities

The project is being implemented with a strong focus on quality control, safety and close coordination among all parties involved. VINA E&C’s participation continues to demonstrate its capability in environmental, industrial and technical infrastructure works with complex construction requirements.

Related news

15.05.2026

VINA E&C updates progress of TP1 Package – Bien Hoa Airbase Dioxin Remediation Project

At TP1 Package of the Bien Hoa Airbase Dioxin Remediation Project – Phase 1, VINA E&C is focusing resources on construction, steel structure, L-block, T-block, HDPE, backfill and supporting works.

04.03.2026

Groundbreaking Ceremony for Lien Khuong Airport Upgrade Project

The runway and taxiway rehabilitation project at Lien Khuong Airport has officially commenced, aiming to meet ICAO 4E standards.

05.12.2025

VINA E&C: Package 24 Thuong Phuoc Border Gate Project

VINA E&C accelerates Package 24 at Thuong Phuoc - Moc Ra International Border Gate. A 139B VND project featuring roadworks, substations, and soft ground improvement.