VINA E&C updates progress of TP1 Package – Bien Hoa Airbase Dioxin Remediation Project

15.05.2026

Project name Bien Hoa Airbase Dioxin Remediation Project – Phase 1
Package Phase 1 Processing (TP1)
Location Bien Hoa, Dong Nai Province
Owner / Main Contractor Nelson Environmental Remediation USA LTD
Time 29/09/2025
Status Ongoing
Sector Environmental & Energy Works / Technical Infrastructure

The Bien Hoa Airbase Dioxin Remediation Project – Phase 1 is being implemented in Bien Hoa, Dong Nai Province. Under Phase 1 Processing – TP1 Package, VINA E&C is undertaking construction, steel structure and supporting infrastructure works for treatment, storage and functional facilities of the project.

According to the latest update, the overall progress of TP1 Package has reached 56.3%. Key work items currently being focused on include corner walls, parapet, ramp, backfill, geotextile installation, HDPE covering, gabion works, L-block and T-block installation, and steel structure works.

Since early May, additional manpower has been transferred from CW1 Package to TP1 Package, with further reinforcement planned in the coming period to accelerate the implementation of key construction activities.

In parallel, steel structure works, precast component installation and supporting infrastructure works continue to be implemented on site. VINA E&C remains focused on progress control, safety, quality and close coordination with relevant parties throughout the execution process.

Moving forward, VINA E&C will continue to follow the construction plan, strengthen site resources and coordinate closely on site to complete TP1 Package work items in accordance with project requirements.

Related news

04.03.2026

Groundbreaking Ceremony for Lien Khuong Airport Upgrade Project

The runway and taxiway rehabilitation project at Lien Khuong Airport has officially commenced, aiming to meet ICAO 4E standards.

05.12.2025

VINA E&C: Package 24 Thuong Phuoc Border Gate Project

VINA E&C accelerates Package 24 at Thuong Phuoc - Moc Ra International Border Gate. A 139B VND project featuring roadworks, substations, and soft ground improvement.

29.09.2025

Bien Hoa Airbase Dioxin Remediation Project – Phase 1

VINA E&C participates in Phase 1 Processing (TP1) of the Bien Hoa Airbase Dioxin Remediation Project in Bien Hoa, Dong Nai as a subcontractor, undertaking construction and steel structure works for treatment, storage and supporting infrastructure facilities.