LACH HUYEN PORT INFRASTRUCTURE - PACKAGE 10


Project Information

Partner:  TOA CORPORATION

Scope of Work:

  • Construction of port, dyke stone
  • Casting and installation of breakwater wall
  • Construction of Cellular sink casting
  • Construction and installation of Tetrapod wave breakers
Construction Period: 2015 - 2019

As a construction contractor, we committed to delivering a range of outstanding and long-term benefits:

  • Shortening the progress, focusing all work through Vincons E&C sole management point, increasing the efficiency of cash flow for the Investor.
  • Optimizing cost for personnel project management.
  • Consulting construction methods, materials in accordance with capital.
  • Taking the initiative in all stages from monitoring organization, coordinating progress to commiting construction safety and quality of the whole project.

Related projects

Major Repair of Berths No. 5 and No. 6 at Vietsovpetro Port

VINA E&C participated in Major Repair of Berths for Receiving 10,000-DWT Vessels in Vietsovpetro Port, Rach Dua Ward, Ho Chi Minh City, including demolition and salvage of reinforced-concrete berth structures and underwater dredging and more than 11,500 m of d600-c phc piles.

Runway & Taxiway Rehabilitation – Lien Khuong Airport

Runway and taxiway upgrade project at Lien Khuong Airport to meet ICAO 4E standards and improve aviation capacity in the Central Highlands.

The Gia Binh International Airport Construction Investment Project

The Gia Binh International Airport Construction Investment Project is a key aviation infrastructure project in Bac Ninh Province, oriented toward the development of a modern international airport and contributing to regional connectivity in Northern Vietnam. At the project, VINA E&C is updating and carrying out construction works related to the VIP terminal, Air Traffic Control Tower, power house and supporting technical facilities. The current scope includes dismantling load-bearing scaffolding, defect rectification on the ceiling surface of Level 1 – Zone 3.1, construction of foundation tie beams for the VIP terminal and power house, as well as rebar and concrete works for water tanks, fire-fighting water tanks, oil tanks and related structures. The project demonstrates VINA E&C’s capability in organizing construction works for aviation infrastructure, with strong requirements for progress, quality, safety and site coordination.

VINA E&C COMMENCES PACKAGE 25: STRENGTHENING INFRASTRUCTURE AT THUONG PHUOC INTERNATIONAL BORDER GATE

Infrastructure Development for Thuong Phuoc and Moc Ra International Border Gates

UPGRADING ROAD NO. 6, LONG PHUOC WARD

On July 29, 2025, VINA E&C officially commenced the Road No. 6 Upgrade Project in Long Phuoc Ward, Thu Duc City, under Package No. 4 – Construction. The project is commissioned by the Thu Duc City Infrastructure Development Center.

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

35-ha Petroleum Services Area – Sao Mai – Ben Dinh

VINA E&C participated in Site Filling, Yard Works and Water Supply and Drainage Systems in Vung Tau City, Ba Ria – Vung Tau Province, including embankments for site-filling works and site filling and construction-platform preparation.

Hung Thai ICD General Service Port

Construction work for Phase 2 general port

Package L – Shoreline Protection Works, Long Son Petrochemicals Complex

VINA E&C participated in Package L – Shoreline Protection Works under the Long Son Petrochemicals Complex Project. The scope included port revetments, site formation, internal roads, soft-soil treatment using PVD, flood-protection and drainage systems, a firewater tank and a pump house.