| Project name | Bien Hoa Airbase Dioxin Remediation Project – Phase 1 |
| Package | Phase 1 Processing (TP1) |
| Location | Bien Hoa, Dong Nai Province |
| Owner / Main Contractor | Nelson Environmental Remediation USA LTD |
| Time | 29/09/2025 |
| Status | Ongoing |
| Sector | Environmental & Energy Works / Technical Infrastructure |
The Bien Hoa Airbase Dioxin Remediation Project – Phase 1 is a specialized environmental project requiring strict technical control and close coordination among participating parties. In Phase 1 Processing (TP1), VINA E&C takes part as a subcontractor, carrying out construction and steel structure works for multiple facilities in Bien Hoa, Dong Nai Province.
The scope of work includes:
- Feed Material Storage Building (FMSB)
- Treated Material Storage Building (TMSB)
- Treatment Plant
- Conveyor Canopy
- Connection Road from FMSB to TMSB
- Treated Material Storage Area and Equalization Pond
- Central Control Container
- Fuel Station
- Workshop
- Office
- Process Water Storage Area
- Infrastructure and Utilities
The project is being implemented with a strong focus on quality control, safety and close coordination among all parties involved. VINA E&C’s participation continues to demonstrate its capability in environmental, industrial and technical infrastructure works with complex construction requirements.

At TP1 Package of the Bien Hoa Airbase Dioxin Remediation Project – Phase 1, VINA E&C is focusing resources on construction, steel structure, L-block, T-block, HDPE, backfill and supporting works.
The runway and taxiway rehabilitation project at Lien Khuong Airport has officially commenced, aiming to meet ICAO 4E standards.
VINA E&C accelerates Package 24 at Thuong Phuoc - Moc Ra International Border Gate. A 139B VND project featuring roadworks, substations, and soft ground improvement.