Hung Thai Port, Warehouse, and Infrastructure Investment Project


In 2016, when the demand for logistics and maritime services in Ba Ria - Vung Tau area grew strongly, the Hung Thai Technical Infrastructure Construction Project, Warehouse System and Maritime Service Port was born as a strategic step to meet the urgent demand for logistics infrastructure.

This is not only a key investment project, but also a typical project demonstrating the long-term vision of Hung Thai Petroleum Maritime Services Joint Stock Company in building a large-scale logistics, storage and trading center in Phu My Town. As the main contractor, VINA E&C has directly undertaken key items, contributing to affirming its reputation and capacity to implement large-scale projects with complex technical requirements.

General Information:

PROJECT: Hung Thai Port, Warehouse, and Infrastructure Investment Project.
CONTRACT PACKAGE: Construction of technical infrastructure, warehouse system & Hung Thai maritime service port
PROJECT LOCATION: Phu My Town, Ba Ria - Vung Tau Province
INVESTOR / MAIN CONTRACTOR: Hung Thai Petroleum Maritime Services Joint Stock Company
JOB DESCRIPTION: - Construction of Warehouse No. 1 (scale 21,722 m2) & No. 2 (scale 17,760 m2)
- Construction of traffic roads (scale 13,800 m2), weighing station, pile driving,...
- Construction of dredging & cargo wharf (scale 5000 ton port)
DURATION: 20/06/2016 - 20/07/2017
ROLE: Main contractor
STATUS: Completed

Related projects

Tan Cang Nhon Trach ICD Warehouse

VINA E&C serves as the main contractor for Package No. 07 – Construction of the Warehouse and Technical Infrastructure under the warehouse investment project at Tan Cang Nhon Trach ICD. The project comprises a 6,750 m² warehouse together with surrounding roads, yards, slope protection and integrated technical infrastructure.

CARBON FIBER AND MATERIAL FACTORY - CONSTRUCTION UTILITIES

VINA E&C participated in Construction of Main Technical Infrastructure – Area A in Phu My, Ba Ria – Vung Tau, including soft soil treatment using the phd method over approximately 91,600 m² and site grading and preparation.

Bio-BDO Biological Products Factory

VINA E&C participated in Soft Soil Treatment Package in Phu My Town, Ba Ria – Vung Tau Province, including soft soil treatment using the phd method over approximately 251,000 m².

Lac Hoa II Wind Power Plant

VINA E&C participated in Construction of Infrastructure and Turbine Erection Yard in Vinh Chau Town, Soc Trang Province, including site clearing, cleanup and removal of organic topsoil and site grading and preparation.

SOUTHERN VIETNAM PETROCHEMICAL COMPLEX PROJECT - BIDDING PACKAGE A2

Concrete and construction work for HPG and EGF Tanks

THI VAI BULK CARGO WAREHOUSE NO. 1 PROJECT

Construction and installation of bulk cargo warehouse No. 1