In 2016, when the demand for logistics and maritime services in Ba Ria - Vung Tau area grew strongly, the Hung Thai Technical Infrastructure Construction Project, Warehouse System and Maritime Service Port was born as a strategic step to meet the urgent demand for logistics infrastructure.
This is not only a key investment project, but also a typical project demonstrating the long-term vision of Hung Thai Petroleum Maritime Services Joint Stock Company in building a large-scale logistics, storage and trading center in Phu My Town. As the main contractor, VINA E&C has directly undertaken key items, contributing to affirming its reputation and capacity to implement large-scale projects with complex technical requirements.
General Information:
| PROJECT: | Hung Thai Port, Warehouse, and Infrastructure Investment Project. |
| CONTRACT PACKAGE: | Construction of technical infrastructure, warehouse system & Hung Thai maritime service port |
| PROJECT LOCATION: | Phu My Town, Ba Ria - Vung Tau Province |
| INVESTOR / MAIN CONTRACTOR: | Hung Thai Petroleum Maritime Services Joint Stock Company |
| JOB DESCRIPTION: | - Construction of Warehouse No. 1 (scale 21,722 m2) & No. 2 (scale 17,760 m2) - Construction of traffic roads (scale 13,800 m2), weighing station, pile driving,... - Construction of dredging & cargo wharf (scale 5000 ton port) |
| DURATION: | 20/06/2016 - 20/07/2017 |
| ROLE: | Main contractor |
| STATUS: | Completed |
VINA E&C serves as the main contractor for Package No. 07 – Construction of the Warehouse and Technical Infrastructure under the warehouse investment project at Tan Cang Nhon Trach ICD. The project comprises a 6,750 m² warehouse together with surrounding roads, yards, slope protection and integrated technical infrastructure.
VINA E&C participated in Construction of Main Technical Infrastructure – Area A in Phu My, Ba Ria – Vung Tau, including soft soil treatment using the phd method over approximately 91,600 m² and site grading and preparation.
VINA E&C participated in Soft Soil Treatment Package in Phu My Town, Ba Ria – Vung Tau Province, including soft soil treatment using the phd method over approximately 251,000 m².
Basic construction package 1
VINA E&C participated in Construction of Infrastructure and Turbine Erection Yard in Vinh Chau Town, Soc Trang Province, including site clearing, cleanup and removal of organic topsoil and site grading and preparation.
Concrete and construction work for HPG and EGF Tanks
Construction and installation of bulk cargo warehouse No. 1