LONG SON PETROCHEMICAL COMPLEX PROJECT - FULL PACKAGE


VINA E&C is honored to take on the role of Turnkey Contractor for the Construction Investment Project of the 35ha Petroleum Service Center – Subdivision 1 (Phase 1). This is a key development that contributes to the establishment of a modern petroleum service complex in Ba Ria – Vung Tau, serving exploration, exploitation, and petroleum logistics activities.

Under the EPC (Engineering – Procurement – Construction) model, VINA E&C is not only responsible for the construction but also for the entire process from technical solutions and detailed design to execution and handover. The construction scope covers site leveling, infrastructure, and auxiliary facilities on an area of 9.7 ha.

Related projects

UPGRADE ALLEY 187 LONG PHUOC STREET, LONG PHUOC WARD

Package 4: Construction (including Traffic Safety Assurance costs and contingency fees)

WORKS OF LEVELING THE SITE, LANDING PLAN, WATER SUPPLY AND DRAINAGE SYSTEM OF ZONE 2

Construction of site leveling, landfill, drainage system, subdivision 2 (21.5ha)

INVESTMENT IN CONSTRUCTION OF WAREHOUSE AT TAN CANG NHON TRACH DRY PORT

Package 07: Construction of warehouse and technical infrastructure

INVESTMENT IN BUILDING PETROLEUM SERVICE AREA

Construction of level 1 leveling level 1 - Division 2 (5.2ha)

Bio-BDO Biological Products Factory

Xử lý nền đất yếu

DIVISION NO. 3 OF THU DUC PRISON CAMP

Package XL01: Construction and installation of all equipment