CONSTRUCTION & OPERATION PROJECT OF NHIEU LOC - THI NGHE WASTEWATER TREATMENT PLANT


Project Information:

Partner: ACCIONA - Vinci Joint Venture
Work items: Supply and construction of 36,000 m3 of concrete, 3900T of steel
Construction time: From 2023

This is a project that started in August 2023, Vina E&C is honored to be trusted by Acciona - Vinci Joint Venture (AVJ) as the DBO general contractor to implement package XL-02 of the Nhieu Loc - Thi Nghe Wastewater Treatment Plant Design, Construction and Operation Project.

This is phase 2 of an important package and has the largest investment level currently in an environmental project in Ho Chi Minh City. The project includes the construction of a wastewater treatment plant with a capacity of 450,000 m3 to improve environmental sanitation and enhance public health.

Related projects

Dioxin processing project at Bien Hoa Airport - IM2

Building long -term and temporary dioxin -contaminated land storage areas, constructing transport infrastructure, excavating and transporting contaminated soil, as well as installing waterproof HDPE lining.

HO CHI MINH CITY WASTEWATER TREATMENT PLANT PROJECT

Wastewater treatment plant expansion

INFRASTRUCTURE CONSTRUCTION PACKAGE - PHASE 1 OF BIEN HOA AIRPORT POLLUTION TREATMENT PROJECT

Following the completion of the Environmental Remediation of Dioxin Contamination at Da Nang Airport in 2018, at the request of the Government of Vietnam (GVN), the United States Government agreed to cooperate in dioxin remediation at the Bien Hoa Airport Area, the primary storage and treatment site for Agent Orange during the Vietnam-US War and the largest remaining dioxin hotspot in Vietnam.

DIOXIN TREATMENT PROJECT AT BIEN HOA AIRPORT – CW1

The Dioxin Remediation Project at Bien Hoa Airport – CW1 is part of a cooperation program between the Government of Vietnam and the United States to overcome the consequences of Agent Orange after the war. VINA E&C is honored to be the main contractor, responsible for the construction of the treatment area, transportation and treatment of more than 270,000 m³ of contaminated soil, ensuring compliance with international environmental and safety standards.

DIOXIN REMEDIATION AT BIEN HOA AIRBASE AREA

Dioxin remediation at Bien Hoa airbase area

HCMC SECOND WATER ENVIRONMENT IMPROVEMENT PROJECT – PACKAGE J

Construction of concrete structure system